[Free] 2019(Nov) EnsurePass VMware 3V0-624 Dumps with VCE and PDF 41-50

Get Full Version of the Exam
http://www.EnsurePass.com/3V0-624.html

Question No.41

A company is designing a new vSphere cluster to support a mission-critical application.

image

The application requires 100% availability and cannot be restarted to recover from an ESXi host failure.

image

The application consists of a group of 16 virtual machines, each with 8 vCPU configured. Which solution satisfies the availability requirements?

  1. Guest OS-based software clustering

  2. vSphere High Availability

  3. vSphere High Availability Application Monitoring

  4. vSphere Fault Tolerance

  5. vSphere Site Recovery Manager

Correct Answer: D

Question No.42

A solution architect has finished conducting interviews and gathering requirements for a company, and has determined that the logical requirements are:

image

two data centers for high availability

image

image

image

synchronous replication to meet the zero minute RPO separating management workloads from application workloads dedicated 10Gb uplink for each low latency server

image

single management point for the entire environment

Which two actions would meet the design requirements? (Choose two.)

  1. Configure 1 Port Group with a dedicated 10Gb Uplink for low latency servers.

  2. Deploy two clusters, one for management workloads and one for application workloads.

  3. Build 2 Port Groups, one for management serves and one for application servers.

  4. Install two vCenter Servers in Enhanced Link Mode.

    Correct Answer: AB

    Question No.43

    DRAG DROP

    You have been tasked with creating a vSphere 6.5 data center design for an organization. During the key stakeholder and SME interviews. a set of goals, requirements, assumptions and constraints were identified. Evaluate each of the requirements, assumptions, and constraints (RAC) and determine which design characteristics apply.

    Match each of the Requirements, Assumptions and Constraints by dragging the RAC buttons (R1-R5) over the text of the appropriate Design Characteristic.

    NOTE: RACs may fit one or more of the Design Characteristics.

    image

    Correct Answer:

    image

    Question No.44

    Customer Information

    The Customer Labtown has a new vSphere 5 environment with one of their line of business applications recently being virtulized. Labtown requires that their Webserver, Database Server, and Fileserver for their line of business app be created into a vAPP. The VM#39;s should start up in a specific order to insure the application starts correctly after an outage or reboot. Labtown also wants the best performance possible out of each VM. There is three hosts in the cluster each running the same CPU and Memory specifications. each host is running at 60% utilization right now. Labtown doesn#39;t have any budget for more hosts.

    Create a logical vAPP design for Labtowns Line of Business Application Requirements

    The server must boot in the following order: DB, Fileserver, WebServer Each VM must perform the best it can with the current cluster configuration

    Instructions

    Place the three VM#39;s on the vAPP

    Place the boot order boxes ontop of each VM to indicate the VM#39;s boot order

    Place the VM stencil for each VM in the DRS rules section if you wish to apply DRS rules to the design

    As long as VM#39;s are on the vAPP stencil marks will be scored

    Correct Answer: See the solution below.

    Explanation:

    Check below for answer solution.

    image

    Question No.45

    DRAG DROP

    A company has one data center site running 50 hosts and 400 virtual machines and requires a vSphere 6.5 design.

    1. The CIO wants to add a secondary site for Disaster Recovery (DR) with A hours RPO.

    2. The application developer is concerned about anticipated growth as several new projects begin.

    3. The CISO is worried about data leaks and theft.

    4. The CTO would like to buy new servers with better specifications and higher consolidation ratio.

      Determine the critical requirements for each of the key stakeholders. Some requirements might have more than one stakeholder.

      image

      Correct Answer:

      image

      Question No.46

      DRAG DROP

      You have been tasked with creating a vSphere 6.5 design for an organization. The customer wants to ensure isolation in the network but does not know when to incorporate physical networks, VLANs and PVLANs.

      Evaluate the design requirement and determine the isolation method to satisfy the design.

      Match each Design Requirement on the left by dragging the red Requirement buttons (R1-R5) over the text of the appropriate Isolation Method.

      NOTE: Multiple Design Requirements may fit each Isolation Method.

      image

      Correct Answer:

      image

      Question No.47

      A company provides critical financial and statistical data for several major banks.

      image

      The company ensures that the bank#39;s customer data is secure and that analytics data is available when needed.

      image

      image

      Customers rely on this data before making crucial business and financial decisions. Just a few minutes of downtime can result in loss of revenue and trust.

      image

      To meet high-availability requirements, the company#39;s IT infrastructure components must be redundant.

      image

      The company established three data centers across the globe and interconnected them with high-speed WAN links.

      image

      Due to the rapid growth of its customers and their increasing demands, the compute, network, and storage were procured and managed by the company#39;s enterprise system administrators group.

      What are its two key challenges? (Choose two)

      1. Data centers across the globe possess manageability problems.

      2. Availability of business applications must be ensured.

      3. Regulatory requirements must be met.

      4. Hardware-defined data centers have limitations.

Correct Answer: BC

Question No.48

An organization#39;s security policy requires a design where the ESXi hosts will be manageable only through vCenter Server. Which two security configurations will help meet this requirement? (Choose two)

  1. enable lockdown mode strict

  2. disable DCUI access

  3. enable lockdown mode normal

  4. disable shell access

Correct Answer: AB Explanation: https://pubs.vmware.com/vsphere-

50/index.jsp?topic=/com.vmware.vsphere.security.doc_50/GUID-94F0C54F-05E3-4E16- 8027-0280B9ED1009.html

Question No.49

An organization is trying to determine whether it should use the Windows version of the vCenterServer or use the vCenter Server Appliance (VCSA). The organization will be using an externalOracle database, and it will manage about 30 ESXi hosts and about 200 virtual machines on 1 vCenter Server, but it would also like to see another group#39;s vCenter Server from the samevSphere client window. Which type of vCenter Server should it use, and why?

  1. The vCenter Server Appliance (VCSA) because it can be used with Oracle

  2. The VCSA because it can support 30 ESXi hosts

  3. The Windows version because it can support Oracle

  4. The Windows version because it can support Linked mode

Correct Answer: A

Question No.50

A customer has requested a vSphere 6.5 deployment design that utilizes vCenter Server and the use of vMware-recommended best practices for securing vCenter Server. Which three actions would satisfy these requirements? (Choose three.)

  1. Utlizing vSphere CLI and vSphere SDK for Perl scripts.

  2. Restricting vCerter Server access to only the management network

  3. Assigning the default Administrator role to all administrator users.

  4. Synchronizing time in vCenter Server with a NIP source.

  5. Removing expired and revoked certificates from vCenter Server system.

Correct Answer: ABD

Get Full Version of the Exam
3V0-624 Dumps
3V0-624 VCE and PDF

Leave a Reply