Question No.51

DRAG DROP

A company is outsourcing its support operations to an external service provider and plans to complete the project by April 1.

image

The external Support engineers must have the ability to power cycle, create, and edit virtual machines settings within their assigned vSphere site.

image

The company maintains three vCenter servers in Enhanced Linked Mode that are run as virtual machines in the supported infrastructure.

image

The vCenter servers will be supposed by the external service provider.

image

Each vCenter server is connected to its own local Platform Services Controller and MSSQL database server.

image

image

The company will provide escalation support and physical access on a per request basis. 99.9% ESXi host uptime is required in this environment, but no SLA has been specified for the

hosted applications.

Drag each statement to its appropriate concept.

image

Correct Answer:

image

Question No.52

DRAG DROP

Sort the traffic by whether it can be encrypted natively by vSphere.

image

Correct Answer:

image

Question No.53

A solution architect has been tasked with designing a new environment that meets the needs of a growing company, and has obtained this information:

image

The current capacity will be exhausted in 180 days, and the new infrastructure must be deployed and in production prior to that.

image

The new severs have a 90-day delivery time.

image

A data center for disaster recovery has been selected, and it is 20 miles way and connected by MPLS.

image

The security team will continue to utilize its current investments and VM Encryption for the new environment.

image

The backup team currently uses Data Domain, and reports show an 8.1 compression and deduplication ratio for backups.

Based on the information obtained, which two statements are assumptions for the new design? (Choose two.)

  1. MPLS will be used to connect the two data centers.

  2. There is 180 days left of current capacity.

  3. Data Domain will get an 8:1 compression and deduplication ratio with the new workloads.

  4. A disaster will NOT affect both data centers.

Correct Answer: AC

Question No.54

Customer Information

The Customer labtown is looking to purchase a new storage system and has hired you to create a logical design. Labtown requires no single points of failure when it comes to the fabric connecting the storage. Labtown has already decided that the new storage system will be using fibre to re-use as much of the previous hardware as possible to increase ROI. Labotwn would also like a tiered disk system broken into three categories with the database sitting in the fastest tier, the two web servers sitting in the medium tier, and the

file server sitting in the slowest tier.

Create a logical design for Labtowns new Storage System Requirements

Create a tiered storage system for Labtown

No single points of failure – Insure storage performance SLA#39;s are met with the four line of business VM#39;s

Instructions

Place VM#39;s on the bottom of the page and connect them with the connector to the storage LUN they will belong to.

Connect the stroage LUN with the service processor with the connector Connect the storage processors to the SAN switch

Place HBA#39;s just below the host, as long as they are close to the host points will be scored

Connect HBA#39;s to SAN switches with either the Fixed, MRU, or RR Connector to dictate the PSP Policy for storage on the ESXi host.

Correct Answer: See the solution below

Explanation:

Check below for answer solution

image

Question No.55

A customer has storage arrays from two different storage vendors at two different sites. The customer warts to restore operations at the secondary site in the event of a disaster. Which VMware technology must be used to meet this requirement?

  1. vSphere replication

  2. vSphere Data Protection

  3. array-based replication

  4. vSphere Fault Tolerance

Correct Answer: A

Question No.56

A customer is deploying a mission-critical Oracle database with high SLA requirements, including high performance and high availability. The customer has chosen to purchase an All-Flash vSAN solution. Which three storage policies should be used? (Choose three.)

  1. RAID5/6 for data disk and RAID1 for OS disk with FTT=2

  2. IOPS limit and checksum should be enabled.

  3. RAID5/6 for OS disk and RAID1 for data disk with FTT=2

  4. Configure multiple disk stripes.

  5. Deduplication and Compression should be disabled.

Correct Answer: ABE

Question No.57

After the vSAN iSCSI Target service is enabled, which statement about iSCSI networks is true?

  1. A separate VMkernel interface may be configured per target.

  2. A single VMkernel interface must be selected for all iSCSI targets.

  3. The vSAN iSCSI Target service always uses all Management VMkernel interfaces.

  4. The vSAN iSCSI Target service always uses the vMotion network.

Correct Answer: D

Question No.58

A solution architect has been tasked with designing a new environment that meets the needs of a growing company, and has obtained this information:

image

The current capacity will be exhausted in 180 days, and the new infrastructure must be deployed and in production prior to that.

image

The new servers have a 90-day delivery time.

image

A data center for disaster recovery has been selected, and it is 20 miles away and connected by MPLS.

image

The security team will continue to utilize its current investments and VM Encryption for the new environment.

image

The backup team currently uses Data Domain, and reports show an 8:1 compression and deduplication ratio for backups.

Based on the information obtained, which two statements are risks for the new design? (Choose two.)

  1. MPLS will be used to connect the two data centers.

  2. The Change Advisory Board will approve all changes.

  3. Current back up space will not be sufficient if using VM Encryption.

  4. The current firewalls will support the additional workloads.

Correct Answer: AC

Question No.59

A solution architect has finished conducting interviews and gathering requirements for a company, and has determined that the logical requirements are:

image

two data centers for high availability

image

image

image

synchronous replication to meet the zero minute RPO separating management workloads from application workloads dedicated 10Gb uplink for each low latency server

image

single management port for the entire environment

Which two actions would meet the design requirements? (Choose two.)

  1. Create two data center objects in vCenter Server.

  2. Configure vSAN Stretched Clustering.

  3. Configure SR-IOV for low latency servers.

  4. Create one folder for Management workloads and one folder for application workloads.

Correct Answer: BD

Question No.60

A company has requested a new vSphere 6.5 design that will allow it to finally break the 80% virtualization barrier by virtualizing its resource-intensive application.

image

The application is highly available by design and includes application-aware clustering software

capable of operating as a fully distributed system.

image

The company#39;s Application Version 2.0 consists of 386 small applications and middleware with non-persistent storage and 24 database virtual machines at each data center.

image

When coupled with a proper load balancing solution, this application can continue operating even with the loss of an entire data center, but the small applications and middleware tiers within a data center must exist within the same broadcast domain.

image

The database tier is tightly controlled with a firewall policy that only allows middleware tier access, and is replicated to other sites using a dedicated circuit.

Which two application requirements apply to this scenario? (Choose two.)

  1. The application will require the configuration of an IGMP stub and helper.

  2. Shared storage is required by the application clustering software.

  3. The application will require one large subnet.

  4. The application will require a method of balancing and recovering sessions between sites.

Correct Answer: BD

Get Full Version of the Exam
3V0-624 Dumps
3V0-624 VCE and PDF

Leave a Reply