Question No.61

DRAG DROP

A global financial company has requested assistance with a new cross-site failover design between two sites which will support business critical applications. Latency between the sites is less than 5ms round-trip.

The company requires:

image

image

application must be restarted quickly in the event of a total site failure allow for planned migration during maintenance

image

applications must be kept online even when migrated due to planned maintenance Drag each statement to its correct concept:

image

Correct Answer:

image

Question No.62

A company has requested assistance with a new cross-site failover design to support business- critical applications.

image

It has two sites when are very well-connected, and latency is less than 5ms round trip.

image

image

The customer requires that its applications be restarted even in the event of a total site failure. The applications must be kept online even when migrated during maintenance.

image

Storage arrays at either site support both synchronous and asynchronous replication. Which two options are accurate application requirements for this scenario? (Choose two.)

  1. The design must ensure continuous application uptime even during a total site failure.

  2. The design must prioritize application availability.

  3. The design must ensure application recoverability at the second site.

  4. The applications are latency-sensitive.

Correct Answer: CD

Question No.63

A validation plan is used to do which of the following? (Select all that apply.)

  1. Verify the design

  2. Verify that the system is functional

  3. Verify that the system meets requirements

  4. Meet current best practices

Correct Answer: ABC

Question No.64

DRAG DROP

Categorize the tools as providing either Availability or Recoverability.

image

Correct Answer:

image

Question No.65

Customer Requirements:

You have been tasked with creating a vSphere 6.5 data center design for an organization. The organization has produced two 24 port FC switches, and Asymmetrical Active/Active storage array (2 storage Processors with 4 ports each) and 22 ESXi Hosts with 2 dual port HBAs in each. Due to budgetary constraints, the organization cannot purchase anymore equipment. They have provided the following requirements:

image

The existing Fibre Channel (FC) Asymmetrical Active/Active Array and FC switches must be used.

image

image

No single point of failure to any datastore. Configuration must provide failover and load balancing.

The customer requires a solution that will accommodate virtual machines with three different I/O load requirements:

image

Static web virtual machines

image

Critical application virtual machines.

image

Object storage for their database virtual machines.

Design Requirements:

Create a logical design that be applied to each of the ESXi Hosts. The design should meet, but not exceed the customer#39;s requirements and should include:

image

image

All required hardware All required resources

Place the required datastore(s) in the storage array(s). Connect the storage processor(s) to the storage array(s). Connect the switch(es) to the storage processor(s) and HBA(s). Connect the ESXi host to the HBA(s) and Path Selection Policies.

image

image

image

image

image

image

Correct Answer: See the solution below

Explanation:

Check below for answer solution.

image

image

image

Question No.66

A development team must provide layer 2 network isolation between virtual machines that are in the same VLAN. The solutions architect must provide additional security between the virtual machines on the same subnet. How can this be done without consuming more VLANs?

  1. Use Virtual Switch Tagging

  2. Use Private VLANs.

  3. Use Virtual Guest Tagging.

  4. Use External Switch Tagging.

Correct Answer: B

Question No.67

DRAG DROP

You have been provided with a list of requirements for a vSphere Design. For each requirement, categorize the requirement as a component of the conceptual, logical, or physical design.

Drag a requirement button (R1-R8) over to the green space provided beside the corresponding Design Phase.

image

Correct Answer:

image

Question No.68

A customer warns to virtualize an Oracle database with vSphere 6.5, but is concerned about its performance. Which three design elements will ensure optimum performance? (Choose three.)

  1. Share as much memory as possible with the balloon driver.

  2. Use VMXNET3 for the network adapter.

  3. Create affinity rules for the virtual machine to a single physical socket.

  4. Use VMware Paravirtual SCSI adapters for data and log vDisk.

  5. Enable Hyper-Threading

Correct Answer: BDE

Question No.69

DRAG DROP

A company has requested assistance with a new cross-site failover design between two sites which will support business-critical applications. Latency between the sites is less than 5ms round-trip.

The company requires:

image

image

application must be restarted quickly in the event of a total site failure allow for planned migration during maintenance

image

applications must be kept online even when migrated due to planned maintenance Drag each statement to its correct concept.

image

Correct Answer:

image

Question No.70

A customer is virtualizing a mission-critical Microsoft SQL database and needs a configuration that provides optimal NUMA performance.

image

There are two possible clusters that the database virtual machine could reside in: Cluster A is vSphere 6.0 and Cluster B is vSphere 6.5.

image

All ESXi hosts contain dual Intel Xeon E5-2650 v3 processors (ie: 2 socket, 10 cores per socket) and 256Gb RAM with vNUMA in its default configuration.

Given this scenario, which three statements are true? (Choose three.)

  1. Enabling CPU Hot Add on a virtual machine will disable vNUMA.

  2. Placing a 10 vCPU VM in Cluster A and configuring it with 2 Sockets and 5 Cores Per Socket will result in 2 vNUMA nodes.

  3. Placing a 10 vCPU VM in Cluster B and configuring it with 2 Sockets and 5 Cores Per Socket will

    result in 2 vNUMA nodes.

  4. Enabling Memory Hot Add on a virtual machine will disable vNUMA.

  5. Placing the VM in Cluster B and configuring it with 5 Sockets and 2 Cores Per Socket will result in 1 vNUMA node.

Correct Answer: ABC

Explanation:

https://kb.vmware.com/s/article/2040375 http://www.techspresso.com/vm-sizing-best-practices-in-vsphere/

https://blogs.vmware.com/performance/2017/03/virtual-machine-vcpu-and-vnuma-rightsizing- rules-of-thumb.html

Get Full Version of the Exam
3V0-624 Dumps
3V0-624 VCE and PDF

Leave a Reply